What are MLI Select points?

MLI Select is CMHC's insured financing program for rental buildings with five or more units. Instead of one fixed set of terms, CMHC scores your project on a points system, and the more points you earn, the better your financing gets. You need at least 50 points to qualify.

Points come from three areas: affordability, energy efficiency and accessibility. The skill is earning them at a cost that is smaller than the financing benefit they unlock. That is what the rest of this post covers.

What the points do for an investor

More points means more leverage, a longer amortization and a cheaper loan. CMHC's tiers look like this:

Total points

Maximum leverage

Maximum amortization

Recourse

50

Up to 85% of value (up to 95% of cost on new construction)

40 years

Full

70

Up to 95%

45 years

Full

100

Up to 95%

50 years

Limited


In plain terms:

  • Amortization: stretching the same loan over 45 or 50 years instead of 25 lowers your monthly payment, which lifts cash flow and your debt coverage ratio.

  • Leverage: at 95% you put far less equity into each deal, so you can buy or build more with the same capital.

  • Insurance premium and rate: more points earn a bigger discount on the CMHC insurance premium. Insured loans also price tighter than conventional multifamily loans, because the lender is protected. CMHC publishes the current premium schedule, and we model it on every deal.


Where the points come from

CMHC awards points in three categories. These are the new-construction figures.

  • Affordability: commit a share of your units to rents CMHC defines as affordable (30% of median renter income). With a 10-year commitment, 10% of units earns 50 points, 15% earns 70 and 25% earns 100. A 20-year commitment adds another 30 points. Rent increases on those units are capped at the provincial rent guideline.

  • Energy efficiency: 20, 35 or 50 points depending on how far the building outperforms the national energy code.

  • Accessibility: up to 30 points for barrier-free design, which requires every unit to be visitable and a share of units to be accessible or universally designed.


Existing buildings are scored on a different scale, so the numbers differ.

How we maximize return per dollar of compliance

Points are only worth chasing when the financing benefit is bigger than the cost of earning them. We built our multiplex model around that test, and it comes down to two decisions.

1. We stay at the energy-efficiency level we already build to

The higher energy tiers add real construction cost, through better envelopes, more advanced mechanical systems and more modelling. On a small multiplex, the extra cost of moving up a tier is larger than the financing benefit the points deliver. So we keep designing to the energy level we have used on our earlier projects, and we earn the remaining points somewhere cheaper.

2. We design one basement unit to be affordable

Our earlier basement layout split the space into two equal units. We now build one smaller unit, around 400 sq ft, and one larger unit, 700 to 800 sq ft. The smaller unit becomes the affordable unit.

This works because a small unit already rents for a modest amount, so committing it to an affordable rent gives up very little. The larger unit stays at market. In our underwriting, the basement still rents at the same price per square foot as before, so we do not give up rental income to earn the points.

Here is how one affordable unit scores on new construction with a 10-year commitment:

Units in the building

One affordable unit as a share

Affordability points

5

20%

70

6

about 17%

70

7

about 14%

50


A single affordable unit is enough to reach 70 points in a five- or six-unit building. Commit for 20 years instead of 10 and CMHC adds another 30 points. Those 70 points open the 95% leverage and 45-year amortization tier. Adding the 20-year commitment can bring you to 100 points and 50-year amortization.

The trade-off to understand

The affordable unit's rent increases are limited to the provincial guideline for the length of the commitment, and the commitment runs with the building. A 20-year commitment suits a long hold. For a shorter hold, a 10-year commitment may be the better fit. We model both on every deal so the numbers decide.

The result

We reach the higher MLI Select tiers by spending very little on the points themselves. We skip the expensive energy upgrades and make one small design change in the basement. The building gets longer amortization, higher leverage and a lower insurance cost, and the rent per square foot stays where it was.

Frequently asked questions

How many points do I need? The minimum is 50. At 70 points you reach 95% leverage and 45-year amortization, and at 100 points you reach 50-year amortization with limited recourse.

Does MLI Select work on a fourplex? It is designed for buildings with five or more units. That is why we plan Toronto multiplexes at five to seven units, using basement units and garden suites to get there.

What does "affordable" mean? CMHC sets it at a rent of 30% of the median renter income for the area. The affordable unit is the one we design to be small, so that rent costs us little.

Can I run my own numbers? Yes. Send us a property and we will score it, model the premium and show the payment at each tier.

Want to see how a deal scores?

Book a call with our team at apollorealestate.ca/book-online and we will run MLI Select points on your property or one of our current multiplex listings.

Blair Johnson, Broker, Apollo Real Estate

This post is general information, not financial advice. MLI Select terms change, so confirm current requirements with CMHC and your mortgage professional.

Sources

Recent Posts

See All

Comments


bottom of page